Skip to main content

First Day in Westport

We spent our first full day in Westport running errands, relaxing, and getting to know the town. After buying groceries in the morning, we spent a few hours indoors before taking a quick trip into town. We drove by Westport Shipyard, where we begin January 3rd, and walked down Westhaven Drive, adjacent to the Westport Marina.


The Westport Viewing Tower on Westhaven Drive


Lina's picture of Ioana taking a picture of Maggie taking a picture of the view from the tower.








We spotted sea lions lounging on the dock of Westport Yachts LLC and barking endlessly.

Comments

Popular posts from this blog

Westport Week 8-Goodbye!

During our last week at Westport, Lina joined Ioana in the finish carpentry crew, while Maggie stayed in the plumbing crew. Ioana and Lina worked together on assembling grids for overhead panels. Maggie continued to install piping systems in the 40-meter model. The three of us handed out our homemade cookies on Monday, and were glad to hear that everyone enjoyed them! On Tuesday, the day that Maggie and Ioana were to leave for their long drive back to Webb, Westport experienced an extremely unusual event: snow! Ioana and Maggie trying not to slip on their way into the yard During lunch, Maggie and Ioana said goodbye and began their trip. Lina was left to work the rest of the week alone before her flight back to New York. She continued to work on the carpentry project, and was really proud of how much she was able to accomplish on her own. Here's Lina chilling alone in the break room A couple of days into the week, Lina developed an allergic reaction at work...

Westport Week 5- Dauntless Launches!

During our fifth week working at Westport, LLC, we finally witnessed the fruits of our labor- the 77 model yacht which we had been working on launched February 1st. Dauntless, as the boat was named, was not fully complete, with some touch-ups still needed, but it was ready to be transferred from the yard to the water. Lina, working now on the mechanical crew, spent the first half of the week cleaning and prepping the engine room before launch. Between the plumbing, electrical, and mechanical crews, Lina spent the most time of the three of us working on Dauntless. Maggie and Ioana, in fairing and plumbing, respectively, moved on to the other yachts currently in construction. When we arrived Thursday morning, the boat had already been lifted onto a trailer and sat half outside of the yard, waiting to be towed. Workers rushed through the yacht, doing some last-minute cleaning, lifting furniture to be installed, and checking that all systems were working properly. At 9 o'clock, ...

Westport Week 7 and Olympic National Park

  During our next-to-last week at Westport, LLC, Maggie worked in plumbing, Lina worked in fairing, and Ioana worked in finish carpentry. Maggie installed piping in the 40-meter boat, which will launch in the summer. Lina helped sand and spot-fill the transom of the 38-meter boat, which had a primer shoot over the weekend. Ioana packed cabinets and installed flooring.  As our time in Westport nears the end, we decided to show our gratitude to the crews that mentored us over the past few weeks. We bought baking supplies from the grocery store and baked cookies (but not before going to the movies to watch Black Panther, obviously). It took us seven hours and half a season of My Name is Earl but the cookies came out great! On Sunday, we heeded the recommendations of many coworkers and drove to Olympic National Forest. We stopped at a couple of trails (but we were too cold to do much hiking), a waterfall, and Ruby Beach, which, to our disappointment, wasn't covere...